9 May 2023, the bell rings for the first time

Icon stands for the Narthex

chanters’ stand for the Sanctuary

Setting the Cross on the Dome, 23 January 23

Raising of the bell that will be placed in the bell tower, 23 January 23

Setting of the dome, June 6, 2022

Setting of the dome, 6 June, 2022

Installing the steel for the bell tower, 6 May 2022

View of the roof above the reliquary, 6 May 2022

Setting of the dome, 6 June 2022

A view of the reliquary, 6 May 2022

Installation of the Cross, 23 January 23

Raising the Cross, 23 January 23

Steel installed for the dome, April 15, 2022

Structural steel being installed, April 14, 2022

Structural steel being installed, April 14, 2022

Structural steel being installed April 14, 2022

Facing the Narthex (March 16, 2022)

(From East Roseville Parkway) March 16, 2022

(Preparing fill the walls with concrete) March 16, 2022

The recently set slab, 12.10.21

Pouring the footings (Sept 2, 2021)

Pouring the footings (Sept 2, 2021)

Pouring the footings (Sept 2, 2021)

Pouring the footings (Sept 2, 2021)

Pouring the footings (Sept 2, 2021)

Pouring the footings (Sept 2, 2021)

Pouring the footings (Sept 2, 2021) Outline of the Narthex and Sanctuary

Pouring the footings (Sept 2, 2021) Outline of the Narthex and Sanctuary